Drilling of water wells in Akhangaran region

 

 
 

Drilling of water wells in Akhangaran region

 

ERIELL Well Solutions is drilling water wells at the facility of AGMK JSC at the Karakhtai-Akchinsky water intake of the Akhangaran field, in order to supply water to the MOF-3 under construction, located in the Akhangaran district of the Tashkent region.

For the technical needs of the facility at the water intake, it is planned to drill 39 wells with an average depth of 45 m (1755 linear meters). All drilling operations are carried out by the UGB-3UK shock-rope machine.

To date, 19 wells (855 running meters) have been drilled, 5 shock-rope machines are in operation, and the declared need for water supply for technical needs is 23,500 m3/hour. The customer is AGMK JSC together with Enter Engineering.